OEE Dashboard
7-day Overall Equipment Effectiveness
OEE
84%
Overall
Availability
100%
Uptime ratio
Performance
87%
Speed efficiency
Quality
96%
First pass yield
OEE Gauge
Downtime by Shift
Equipment Performance (7d)
| Device | Category | Location | Downtime | Availability | Alarms |
|---|---|---|---|---|---|
| T50 Central Granulator #1 | Size Reduction | Elkhart Production Center | 0h | 100% | 0 |
| HE Central Chiller #2 | Temperature | Elkhart Production Center | 0h | 100% | 0 |
| VTC Plus Conveying System #3 | Conveying | Elkhart Production Center | 0h | 100% | 0 |
| TrueTemp TCU #4 | Temperature | Elkhart Production Center | 0h | 100% | 0 |
| GH-F Gravimetric Feeder #5 | Conveying | Elkhart Production Center | 0h | 100% | 0 |
| EcoFlow Energy Monitor #6 | Energy | Elkhart Production Center | 0h | 100% | 0 |
| TS5 TCU #7 | Temperature | Elkhart Production Center | 0h | 100% | 0 |
| TS5 TCU #8 | Temperature | Elkhart Production Center | 0h | 100% | 0 |
| GH-F Gravimetric Feeder #9 | Conveying | Elkhart Production Center | 0h | 100% | 0 |
| VTC Plus Conveying System #10 | Conveying | Elkhart Production Center | 0h | 100% | 0 |
| VTC Plus Conveying System #11 | Conveying | Elkhart Production Center | 0h | 100% | 0 |
| BD Batch Blender #12 | Blending | Louisville Assembly | 0h | 100% | 0 |
| GP Portable Chiller #13 | Temperature | Louisville Assembly | 0h | 100% | 0 |
| GP Portable Chiller #14 | Temperature | Louisville Assembly | 0h | 100% | 0 |
| VTC Plus Conveying System #15 | Conveying | Louisville Assembly | 0h | 100% | 0 |
| VTC Plus Conveying System #16 | Conveying | Louisville Assembly | 0h | 100% | 0 |
| BD Batch Blender #17 | Blending | Louisville Assembly | 0h | 100% | 0 |
| TrueTemp TCU #18 | Temperature | Louisville Assembly | 0h | 100% | 0 |
| Accumeter Ovation Continuous Blender #19 | Blending | Louisville Assembly | 0h | 100% | 0 |
| LoadMaster Dryer #20 | Drying | Louisville Assembly | 0h | 100% | 0 |